NOT such a good idea! It hasn't exactly been WARM but over the past 2 weeks it has been above freezing a few times so plywood has been going up. Sadly, today was beautiful as are the next 3 weekdays predicted to be but of course dark arrives at my house before I do on work days. Am I likely to be taking any time off this week to work on finishing up the plywood? Not a chance.
Not to worry, Saturday and Sunday I get to stay home but then temperatures are predicted to return to around freezing for the weekend. Top that with the fact that the worst part of the installation is yet to come, the upper part. Given that a sheet of 3/4" CDX plywood weighs around 75 lbs and the gable of the house starts 8' above ground, this promises to be a formidable task. There may be more cutting on the upper level as a 32" wide piece will weigh significantly less than a 48" wide piece.
The biggest challenge is over, the sheathing behind the electric meter went in last Saturday. It took cutting a keyhole (?) slot to slip over the wiring where it enters the electrical box but that was the most worrysome part of this process. There will be another hurdle at the top where the wire comes to the house but it won't require cutting around, just sliding the plywood under the pole.
Now, if I can just manage to haul the new patio door from the garage to the back of the house, real progress will be happening.
No comments:
Post a Comment