The house now has a plywood shell(well, mostly) and is wrapped in plastic. Just in time, 8-10 inches of snow arrived yesterday and having a plastic coating should discourage that blowing in between the boards. I even managed to finish it without any additional injuries or disasters.

The new door is yet to be installed but that will probably have to wait until I can count on the temperature not dropping below zero, mid- job. Nothing like a 5 foot wide hole in the wall when it starts snowing. The new door, which is not actually new, still needs a little work before installation. It is a recycled door and needed some cosmetic work when I bought it.

I removed the moulding that held the glass in place and scraped away all the old glazing compound. I have reglazed and replaced the moulding on most of it but still a little to do then it all needs a good painting. I also need to divise a system to protect it from little dog paws that like to pat, pat all over the door when they are sent out to play. I haven't figured out how I'm going to do that yet. Perhaps utilizing the screen door off the old patio door?

Well, at least there are hints that spring will be here soon, so I may be able to make faster progress before long. Today there was no chance for working outside. The snow is settling but there is still a good 6" over the yard, except where I shoveled out "potty" areas for the dogs. They just refuse to wade out in that snow to take care of their business. Of course their bellies were dragging in the snow so I guess I can't blame them.

No comments: